MDOT SHA OMT/OOC Facility
Forrester Contruction‘s design/build project involved the construction of a materials testing laboratory building and an office building at MDOT SHA OMT/OOC Facility, which contained testing and administrative areas, training, and meeting rooms. The laboratory building consists of seven independent testing areas- asphalt, structures, cement, concrete, soils, chemical, and instrument labs. Some of the specific features of these areas include a 100% Drying Room reaching over 120 degrees in temperature, 100% Moisture Room requiring constant humidity similar to a sauna, and concealed dust collection areas.
Project Location:
Hanover, MD
Architect:
KlingStubbins
Size:
100,000 SF
Schedule:
17 months