St. Patrick’s Episcopal School
This Forrester Construction project is a new three-story St. Patrick’s Episcopal School gymnasium, which is a cast-in-place concrete structure built into an extremely steep embankment. The lower two levels of the building are parking areas. The gym also contains a performance stage with acoustical walls, ceilings, and roof deck; as well as specialty theater lighting and a sound system.
Project Location:
Washington, DC
Architect:
Moore Poe Architects
Size:
48,000 SF
Schedule:
13 months