Embassy of Luxembourg
Forrester was selected for the phased replacement of the Mechanical System within the Embassy of Luxembourg. The work occurred while the Embassy was fully occupied and operational.
The project included the mechanical system replacement for an 18,000 SF historic embassy building. The renovation consisted of the removal of the existing water piped HVAC system and replacing it with a new refrigerant-based system and rooftop equipment.
The project also included the replacement and restoration of the building’s associated finishes.
Project Location:
Washington, DC
Engineer:
Girard Engineering, PC
Size:
16,000 SF
Schedule:
5 months